Posted: Thursday, October 20, 2016. 10:26 a.m. CST.
By BBN Staff: Breaking Belize News has confirmed that the reconstruction of the Low Level Wooden Bridge spanning the Macal River in San Ignacio / Santa Elena has been completed.
The Ministry of Works issued a press release just now informing the public that a final inspection of the reconstruction of the bridge has been completed and the bridge was opened for use today, October 20, 2016 at 10:00 a.m.
According to the Ministry of Works, the reconstruction works were done by a local contractor and was supervised by engineers from their Ministry.
The Ministry thanks the general public for their patience during the period of reconstruction of the bridge.
© 2016, www.breakingbelizenews.com. This article is the copyrighted property of Breaking Belize News. Written permission must be obtained before reprint in online or print media. REPRINTING CONTENT WITHOUT PERMISSION AND/OR PAYMENT IS THEFT AND PUNISHABLE BY LAW.